Secondary crushing system with filler separation – 2012

Client: Asfalt Ab (Skanska Group)

Site Location: Gothenburg (Sweden)

General Contractor: Sandvik Mining & Construction

Erection: IMSAT SA

Commissioning assistance: IMSAT SA

Scope of work:

  • Connection and extraction of material from the silos through 2 belt feeders
  • 6 belt conveyors – total length 134m (with metal detectors & belt scales)
  • One turning tower
  • Crusher building installation (steel structure and vertical crusher installation)
  • Screening building installation (steel structure & equipment)
  • Classifier building (steel structure & Air classifier installation)
  • 2 Screw conveyors (feeding classifier & filler storage)
  • Assistance to commissioning