This platform is within the scope of the development project champ OFON2 offshore from NIGERIA.

Final Client: TOTAL Nigeria Ltd

Main Contractor: EIFFAGE

Subcontractor rank 1:  SNEF

Subcontractor rank 2: IMSAT SA

Construction site: Fos sur Mer, France

Mechanical Erection: EIFFAGE

Electrical Erection:  SNEF and IMSAT

Electrical Erection period: 01.08.2012 – 29.10.2013

Activities on site IMSAT:

  • Installing of cable trays E&I
  • Installing of devices E&I
  • Installing of panels
  • Welding platform structure
  • Manufacture of supports cable trays and devices E&I
  • Cables laying
  • Cables connections
  • Installing of grounding system
  • Installing of piping and tubing for instrumentation