Holcim Aleşd cement plant, Romania – upgrade – 2003

RAW MATERIAL PREBLENDING STORAGE

Civil works for:

  • Preblending Building
  • Railway for Reclaimer ( Stacker )
  • Belt conveyor system from angle tower up to dosing building
  1. Excavation 39,700 cu.m
  2. Plain concrete 1,750 cu.m
  3. Reinforced concrete  4,450 cu.m
  4. Reinforcement 375 to
  5. Embedded plates 35 to

Manufacture of steel structure for:

  • Preblending Building
  • Belt conveyor bridges and columns
  1. Steel structure 1,420 to

Erection of belt conveyors, tripper, reclaimer, chutes

  1. Manufacture & equipment erection 210 to

Cladding  18,000 sq.m

 


 

COAL GRINDING AND DOSING

Hot gas duct from preheater to coal mill, including foundations and steel structure

  1. Excavation 200 cu.m
  2. Plain concrete 10 cu.m
  3. Reinforced concrete 110 cu.m
  4. Reinforcement 5 to
  5. Embedded plates 1 to
  6. Manufacture and erection 75 to  of steel structure

Civil works for column foundations, mill building foundations and floors

  1. Excavation 2,200 cu.m
  2. Plain concrete 500 cu.m
  3. Reinforced concrete 800 cu.m
  4. Reinforcement 85 to
  5. Embedded plates 10 to

Manufacture and erection of mill building steel structure 360 to

Manufacture and equipment erection  192 to

Erection for water / compressed air system, inertisation, vacuum cleaning  32 to

Claddings  2,000 sq.m

 


 

CEMENT TRANSPORT AND STORAGE

Repairing of cement silos no. 1 ÷ 6 and columns for conveyor bridge

  Plastering ( compressed air )   4,150 sq.m

Civil works for belt conveyor system from cement mill to existing transport system

  1. Excavation 2500 cu.m
  2. Plain and reinforced concrete 1000 cu.m
  3. Reinforcement 105 to
  4. Embedded plates      10 to

Manufacture and erection for conveyor bridges and columns 650 to

Manufacture and erection of steel parts for belts conveyors, bag filters and air slides 252 to

Cladding  8,500 sq.m

 


 

CEMENT LOADING AND DISPATCHING

Repairing of elevator’s tower, packing building, compressor room, transport system

  Plastering ( compressed air )   4,100 sq.m

Civil works for bulk loading station, packing building including electrical station

  1. Excavation 500 cu.m
  2. Plain and reinforced concrete 350 cu.m
  3. Reinforcement 25 to
  4. Embedded plates        5 to

Manufacture and erection of steel structure for Bulk loading station and electrical station165 to

Manufacture and erection for steel parts of belt conveyors, bag filters, air slides elevators and packing machines  250 to

Cladding  7,200 sq.m

 


 

COAL/PETCOKE TRANSPORT

Manufacturing and erection of steel structure (640 t),

Equipment erection

 


 

Dedusting installations for grate cooler and raw mill / kiln

Detailed engineering for 862 tons of steel parts

Supply of steel parts 862 tons

Erection of steel parts and equipment