Common Flue Gas Desulphurization Plant for Groups 1&2 of Craiova II Power Plant

Owner: CET II Craiova (Thermal Powerplant)

Main contractor: Alstom Power

Timeline: 2014-2016

IMSAT made the design, manufacture, installation and commissioning of the electrical part of the gas desulphurization plan.

Electrical part consist of:

  • Oil Power Transformer 12/16MVA 15.75/6kV – 2 pcs
  • Busbar system 15.75kV – 2 set (30m/set)
  • Medium Voltage Switchgear –ABB – 20 pcs
  • Power Transformer Dry Type Cast Resin 1600kVA, 6/0.4kV – 2pcs
  • Low Voltage Switchgears (Schneider) – 15 columns (2 switchgears)
  • Power Transformers Monitoring, Diagnose and Protection System
  • DC System and Battery station
  • 230VAC UPS System
  • Medium voltage cables, low voltage cables, command cables – 170km
  • Cable trays – 20 km
  • Lighting System and sockets
  • Lightning System and Secondary Grounding System
  • Communication System
  • Firefighting and fire detection system
  • HVAC System