Basarab cable-stayed bridge, Bucharest – 2009-2011

Timeline: 2009-2011

Subcontractor for the consortium FCC – ASTALDI

  • Installation of the overhead contact line for the tranmway
  • Construction of the containerized sub-station
  • Submission of the DC cables for electric supply
  • Submission of the optic fibre for the remote control
  • Installation of automations, and supply centers for overhead contact line
  • Electrical installation for platforms Ÿ
  • Installation for draining dispersion currents Ÿ(Cathodic protection of the bridge)